Metrolink is the UK’s largest light rail network, with 93 stops across seven lines. Approximately 7.2 million miles are ‘clocked up’ across the network each year by our fleet of 120 trams, which currently cater for more than 41m journeys.

KeolisAmey Metrolink operates and maintains the network for us. We’ll be publishing punctuality and reliability performance information every four weeks for the entire network, as well as a more detailed breakdown for each line.

It will include the number of cancellations and incomplete journeys and the main reasons for any disruption during the period. A service is deemed punctual if it departs within two minutes of the advertised frequency. The punctuality measure shows the percentage of trams which are operating within this target. The reliability measure shows the percentage of miles operated against the planned mileage for all services.


Performance period 8 (14 Oct until 10 Nov 2018)

Metrolink Performance report PDF


Performance period 7 (16 Sept until 13 Oct 2018)

Metrolink Performance report PDF


Performance period 6 (19 Aug until 15 Sept 2018)

Metrolink Performance report PDF


Performance period 5 (22 July until 18 Aug 2018)

Metrolink Performance report PDF


Performance period 4 (24 June until 21 July 2018)

Metrolink Performance report PDF


Performance period 3 (27 May until 23 June 2018)

Metrolink Performance report PDF


Performance period 2 (29 April until 26 May 2018)

Metrolink Performance report PDF


Performance period 1 (1 April until 28 April 2018)

Metrolink Performance report PDF


Performance period 13 (4 March until 31 March 2018)

Metrolink Performance report PDF


Performance period 12 (4 February until 3 March 2018)

Metrolink Performance report PDF


Performance period 11 (7 January until 3 February 2018)

Metrolink Performance report (PDF)